Healthcare

  • Gallerias only display when viewing a node by itself on the page. See README.txt for help.
  • Gallerias only display when viewing a node by itself on the page. See README.txt for help.
  • Gallerias only display when viewing a node by itself on the page. See README.txt for help.

Brigham & Women’s Hospital Ambulatory Care Center

Boston, Massachusetts

As one of the leading hospitals in the U.S., Brigham and Women’s is constantly looking to incorporate the latest treatments and equipment into existing buildings with limited space and tight schedules. So when the hospital needed a company that could assure patient comfort and privacy while also anticipating changing technology and care patterns into the design, they chose MOCA Systems.

MOCA Services: 

MOCA Services

  • Cost Engineering
  • Scheduling
  • Construction Simulation (MOCABuild)
  • Construction Oversight
  • Progress Audits, Monitoring and Payment Control
Quote: 

“MOCA gave us new insight into the cost and schedule drivers on this project. We’re always scrambling to get the work going and done as quickly as possible, and now that we have our “MOCA library” of BWH rooms and suites, we use MOCA to establish the cost of suites with different layouts at the earliest budget feasibility stages, for much faster review and decisions.”

Director of Real Estate and Facilities, Brigham & Women’s Hospital

Homepage Promo Image: 
260h_850boylstoncopy.jpg

Fort Sam Houston Military Medical Center

San Antonio, Texas (2007 – 2011)

Under the BRAC directive, the DoD is streamlining its portfolio of installations to optimize their value, significantly reduce cost of ownership, and facilitate transformation, common operations, and shared business functions. BRAC combined with significant military construction (MILCON) projects created a more than $3 billion surge in construction of over 180 projects including 78 major facilities at four military installations in the San Antonio area.

MOCA Services: 

MOCA Services

  • Economic Market Analysis
  • Constructability Reviews
  • Cost Engineering
  • Construction Simulation (MOCABuild)
Homepage Promo Image: 
260h_SAMMCRendering.jpg

Fort Belvoir Community Hospital

Fairfax County, Virginia (2007 – 2011)

The Fort Belvoir Community Hospital is a new facility designed to treat wounded soldiers and their families, and will shift nearly 19,000 workers to Fort Belvoir in Fairfax County, VA. It is budgeted at $650 million and is being built in conjunction with the Army's program for BRAC with an overall completion date of 2010. The 1.2 million square foot hospital will be staffed and operated by the Army Medical Command.

MOCA Services: 

MOCA Services

  • Program & Design Management
  • Master Integrated Scheduling
  • Cost Engineering
  • Earned Value Management
  • Construction Simulation (MOCABuild)
  • Construction Oversight
  • Progress Audits, Monitoring, and Payment Control
Quote: 

“MOCA Systems is an integral part of the USACE team, providing EVMS, cost estimating, scheduling and construction management support. The responsiveness, technical expertise and professionalism of MOCA Systems exceeded our expectations. They have been a force multiplier in the first year of this project.

Major changes in the awarded scope of construction required rapid cost and schedule risk analysis to support design and construction scope decisions – and MOCA delivered. From analyzing cost trends to predict estimate at completion, to complex schedule analysis, manpower analysis, trending and reporting, and work placement verification, MOCA systems has provided critical management tools for the USACE Norfolk District to successfully manage this project.”

Chief, Project Development, Belvoir IPO - Community Hospital, USACE Norfolk District

Homepage Promo Image: 
260h_FtBelvoirModel(2).jpg
Syndicate content