MB

  • Gallerias only display when viewing a node by itself on the page. See README.txt for help.
  • Gallerias only display when viewing a node by itself on the page. See README.txt for help.
MOCABuild

Ala Moana Retail Center Expansion

Honolulu, Hawaii (2006 – 2008)

Ala Moana Center ranks as one of the most visited and profitable shopping centers in the world. Just 1.25 miles from the heart of Waikiki and one block from the Hawaii Convention Center, the center has completed a $100 million dollar retail expansion through General Growth Properties. The expansion project included Hawaii’s first full-line Nordstrom department store and 30 additional retailers as part of a new wing to the mall.

MOCA Services: 

MOCA Services

  • Cost Engineering
  • Local Market Economic Analysis
  • Scheduling
  • Construction Simulation (MOCABuild)
  • Change Order Analyses
Quote: 

“The services provided by MOCA Systems have allowed General Growth Properties to better plan, forecast, and execute our capital expenditures,,. MOCA Systems has helped GGP save 10-15% in portions of our project cost. In addition, this technology and the professionals at MOCA have been able to save us millions through the use of MOCABuild. GGP looks forward to working with MOCA Systems on future projects in Hawaii.”

Director of Construction, General Growth Properties, Hawaii Region

Homepage Promo Image: 
260h_pic1.jpg

MOCA Systems featured in Constructech Magazine cover story

in

The U.S. Air Force is held to stringent requirements when it comes to designing and building new facilities. Military construction bills must be approved by the United States Congress with full accounting of expenditures. As such, managing the costs, coordinating schedules and delivering projects on time is critical to the efficient and success management of these programs.

Quote: 

“MOCA provides a good basis to help us begin the actual design of the project while establishing a better cost estimate that we can then reapply to our programming documents, which eventually go before Congress. The cost and accuracy of the tool helps us go to Capital Hill with great confidence.”

MOCA can provide this cost and schedule information very early on in the process, whereas an architectural/engineering (A/E) firm runs early cost estimates off of what we call parametric models. These are generated based on total square footage in a facility, for example. This model does not account for a hike in construction material prices or adjust for various labor environments. The MOCA model helps the Air Force consider all factors early on in the process.”

Chief of Military Design and Construction, USAF Air Mobility Command HQ

Homepage Promo Image: 
ct.jpg
Syndicate content